Scripps Pier & Institute 2/2 ID Number: 01.00576
Architect/Contractor, original pier: Mercereau Bridge and Construction
Company
Date of Construction: 1915
Materials: Reinforced concrete pilings
Architect/Contractor, current structure: Ferver Engineering all-concrete
structure
Date of Construction: 1988
Materials: All-concrete structure